This is yet another new junction box.
|
One waire was too short so a third junction box was needed.
|
This vertical box above the entry was fabricated to keep the coming insulation from falling out.
|
This is one of four new interconnected smoke detectors, all running on 120V.
|
This fixture had to be moved 9 inches to the left. It only took 2.5 horus to do.
|
The truck is ready to fill the attic and walls.
|
Follow the hose...
|
It always knows...
|
Side walls are filled first.
|
A few holes in the plaster to shoot the stuff into.
|
R-16 batts are for the outer walls.
|
30 minutes later...
|
30 minutes later...
|
And so on...
|
And so on...
|
Until it is nearly done.
|
Sound insulation in the ceiling will reduce THX problems caused by DVDs.
|
In other words, the home theater will be loud!
|
DCP_0008.JPG
|
DCP_0009.JPG
|
Steve blows in the insulation to a depth of 14 inches.
|
The cellulose is beginning to pile up.
|
It's like a snowstorm hit the attic.
|
Working in the other side, Steve fills the void above the stairs.
|
Here is the completed pile.
|
The final snow drift.
|