Phase 1
Phase 2

Living Room 2003: Phase 3, Insulation

Phase 4
Phase 5
Phase 6
thumbnail
This is yet another new junction box.
thumbnail
One waire was too short so a third junction box was needed.
thumbnail
This vertical box above the entry was fabricated to keep the coming insulation from falling out.
thumbnail
This is one of four new interconnected smoke detectors, all running on 120V.
thumbnail
This fixture had to be moved 9 inches to the left. It only took 2.5 horus to do.
thumbnail
The truck is ready to fill the attic and walls.
thumbnail
Follow the hose...
thumbnail
It always knows...
thumbnail
Side walls are filled first.
thumbnail
A few holes in the plaster to shoot the stuff into.
thumbnail
R-16 batts are for the outer walls.
thumbnail
30 minutes later...
thumbnail
30 minutes later...
thumbnail
And so on...
thumbnail
And so on...
thumbnail
Until it is nearly done.
thumbnail
Sound insulation in the ceiling will reduce THX problems caused by DVDs.
thumbnail
In other words, the home theater will be loud!
thumbnail
DCP_0008.JPG
thumbnail
DCP_0009.JPG
thumbnail
Steve blows in the insulation to a depth of 14 inches.
thumbnail
The cellulose is beginning to pile up.
thumbnail
It's like a snowstorm hit the attic.
thumbnail
Working in the other side, Steve fills the void above the stairs.
thumbnail
Here is the completed pile.
thumbnail
The final snow drift.